Home / Products / Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW
Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW
Mining PDU

Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW

Quick AnswerMining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW — an IDCPDU Mining PDU for mining farms and hash centres.
  1. Per-outlet remote switching — A hung node or miner is power-cycled from the control room in seconds — no trip to the rack, and nothing else on the strip goes dark.
  2. Metering per outlet — You see which node actually draws the power, so capacity planning and customer billing rest on measured numbers instead of guesses.
  3. Surge clamped before the power supplies — Lightning and switching surges are discharged at the strip; the status lamp shows when the cartridge is spent instead of failing silently.
  4. Three-phase feed, load spread over L1/L2/L3 — The rack is not hung on one leg, and the 240 kW envelope matches GPU, blade and miner density.
  5. 20 outlets on one strip — A single strip feeds a whole rack, so adding a node no longer means a second PDU and a second feed cable.
  6. 0U vertical — no rack units consumed — The strip hangs on the rear post, so every U stays available for servers.
  7. Breaker ahead of the outlets — A fault trips inside the strip, not at the upstream panel — the rest of the row keeps serving traffic.

Tel: +86-574-63783045 · ricky@idcpdu.com

Contact Us
SHARE:

Product Description

  • Twenty SA-20 ports on one 400 A three-phase strip
  • Per-port switching and metering over TCP/IP
  • 240 kW behind a single five-core feed
  • One 400 A three-phase feed can carry a whole row of mining racks when the strip behind it is built for that current. This strip splits 400 A across twenty SA-20 ports, each with its own breaker, its own red current display and its own relay, so a miner that has dropped off the pool is power-cycled from the dashboard while the other nineteen keep hashing. Keyed five-core terminals, a 400 A moulded-case main breaker and surge, overload and earth-leakage protection sit in the same enclosure, which removes the row of distribution boxes that would otherwise stand between the busbar and the machines. One master strip cascades to several slaves over the network, so a 200 kW hall answers to a single IP address.

Frequently Asked Questions

What is the input connection of Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW?

5-core cable, OT terminal junction box

What is the input voltage of Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW?

⁦⁦415–480⁩⁩ V AC three-phase, 50/60 Hz

What is the rated current of Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW?

400 A

What is the max input current of Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW?

410 A per phase

What is the max power of Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW?

240 kW

What is the monitoring interface of Mining Rack PDU 20-Port SA-20, Switched, 400 A, 240 kW?

TCP/IP, SNMP v1/v2/v3, Modbus TCP, RS485